Synchronization Panels are mainly designed and used to meet power system requirements. They will operate on an automatic mains failure system, so that when the main supply is interrupted in one or all phases (after an adjustable delay period) the generator sets will kick-off together. After an initial warm-up period (adjustable) the generators will synchronize with each other through motorized circuit breakers or contactors onto a common bus-bar. Then the motorized changeover switch will be closed and the load will be connected to the main distribution box.
The load share units continuously monitor the load. During low demand situations one or two generators will be shut down to save on fuel consumption. Once the demand rises the second and third generator will be restarted, synchronized and reconnected to the load. When the AMF control unit detects that the main supply has been restored, an adjustable observation period is activated before the main supply is reconnected. A cool down period will then follow, after which the generator sets will be shut down.
Our high-quality ranges of synchronizing panels are available with capacities and are fabricated by our engineers using premium quality electrical components including copper bus bar, insulations, wires/cable, PVC channels, transformers, meters and switches.
Key features of Synchronizing Panels
Socket Panels
DC Panel
Junction Box
Street Lighting Control Cabinets
Swimming Pool & Fountain Panels
HVAC & AHU Panels
Pump Control Panels
Feeder Pillars
© 2023 All rights reserved. Quick Electric Industrial Company Ltd.